Here is a small sampling of some of Mead & Hunt's proudest and most challenging work.
Mead & Hunt, Inc.

Roundabouts – CTH G

De Pere, Wisconsin

Mead & Hunt designed plans to convert a two-lane rural roadway to a two-lane urban roadway with a center two-way continuous left-turn lane, bike lanes on each side, and sidewalks.  The project used three separate roundabouts.  The high school adjacent to the project re-routed their main entrance to create a four-legged intersection at one roundabout and a nearby middle school indirectly used the second roundabout.  The third roundabout was installed at a T-intersection to reduce traffic speeds and provide for safer pedestrian movements.  The average daily traffic on this roadway was 7,100 at the time of construction.