Project Information
This page was last updated on July 2, 2009 with draft master plan chapters.
The following working documents have been developed as part of the study:
Master Plan Cover
SAW_Master_Plan_Report_Cover.pdf
Master Plan Table of Contents
Table_of_Contents.pdf
Chapter 1 - Inventory of Existing Facilities
This chapter provides a summary of the existing facilties at the airport including aviation and non-aviation uses.
Chapter_1_Inventory_FINAL_DRAFT.pdf
Chapter 2 - Projections of Aviation Demand
This chapter provides the summary of projections of aviation activity at the airport through 2030.
Chapter_2_Projections_of_Aviation_Demand_FINAL_DRAFT.pdf
Chapter 3 - Demand/Capacity Analysis & Facilitiy Requirments
This chapter provides a summary of the available capacity and provides a summary of the facilities that are required for the operation of the airport to meet existing and future operational projections.
Chapter_3_Demand_Capacity_Requirements_and_Determination_of_Facility_Requirements_FINAL_DRAFT.pdf
Chapter 4 - Alterantive Analysis
This chapter provides a summary of the various alternatives evaluated to address the facility requirements.
Chapter_4_Alternative_Plan_Concepts_FINAL_DRAFT.pdf
Chapter 5 - Recommended Development
This chapter summarizes the preferred alternatives for development at the airport. These recommendations include: runways, taxiways, building area development and passenger terminal improvement.
Chapter_5_Recommended_Plans_FINAL_DRAFT.pdf
Chapter 6 - Environmental Overview
This chapter addresses over twenty different environmental categories and provides comments on potential impacts associated with proposed development.
Chapter_6_-_Environmental_Overview_FINAL_DRAFT.pdf
Chapter 7 - Economic Considerations
This chapter summarizes the economic considerations associated with the operation of the airport.
Chapter_7_Economic_Considerations_FINAL_DRAFT.pdf